Sectors - Heavy Industry
|
Steel Barrier Former Stacking |
The sections of formed parts travel along 20m of conveyor and arrive at the pickup point. Here, depending on the product length, up to 3 synchronised servo controlled magnetic heads pickup the part and deliver it to the stacking area. The integrated turnover unit can invert each section prior to being picked up.
At a maximum material feed velocity of 25m/min, the stacking heads can complete a cycle in 10 seconds.
The stacking pattern is configurable to a recipe which will determine the stack height. When the stack is complete, it is discharged to the removal conveyors where they are manually strapped before being removed by FLT
|
|
|
![]() |
![]() |
![]() |
![]() |






